精品国产一区二区三区忘忧草_欧美日韩黄色一区二区_亚洲成在人线免费_亚洲精品永久免费

DJS-II 順豐包郵
  • DJS-II 順豐包郵
  • DJS-II 順豐包郵
  • DJS-II 順豐包郵

產品描述

電壓35kv 電流100A 質保一年 認證CCC 材質防觸電
When the lightning arrester flows through lightning wave, operation wave or power frequency overvoltage, the strong action current will be transferred from the leakage current measurement circuit to the counter circuit, and the leakage current measurement circuit is protected. The counter part uses the principle of electromagnetic induction to obtain the signal of operation wave or power frequency overvoltage current, and then processed by the microprocessor in the display to record the number of actions
Scope of application: 3 ~ 35kV system discrete lightning arrester without (with Series) gap; 2. Power supply: AC / DC 110 ~ 220V, < 1.5W;3. Counting form: A, B and C phases are counted separately and displayed on centralized LCD; 4. Minimum capture discharge current: < 10A; 5. Minimum capture pulse width: < 1 μ s; 6. Leakage current monitoring range: 0 ~ 20mA; 7. Built in clock, power failure holding time: half a year; 8. Storage capacity: > 2000 pieces;  9. Communication interface: 485, class Modbus protocol; 10. Independent address code can be set
DJS-II
Data can be downloaded and analyzed with special software through mobile computer and 485-232 transfer interface. Overall dimension, installation method and wiring diagram  Overall dimension
DJS-II
Method of use1. Connect the corresponding wiring according to the operation manual; 2. When powered on, the LCD is displayed in turn according to the sequence of phase a counting, phase B counting and phase C counting;  3. Short touch the "F" key to check phase a count, phase B count, phase C count, local address, current date and current address in turn Time, when the current time is displayed, if it is djs-ii type, press the "F" key three times to zero the leakage current value (please pull out the data cable during zero calibration).
DJS-II
Long press the "F" key, then "CLR" will prompt whether all counts are cleared, and "-" will be displayed. After a "-" appears  Execute the reset operation, and release the "F" key to exit before a "-" appears; 5. After pressing "▲" and "▼" at the same time to enter the setting state, the "year" bit flashes first, which can be adjusted by up and down keys; adopt Short touch "F" to switch to "month", "day", "hour", "minute" and "second" in sequence. When the second adjustment is over, short touch "F" to display the address code of the counter. If adjustment is needed, press "▲" and "▼" to adjust, and the adjustment will take effect immediately; During the adjustment, if the operation stops at any position for more than 7S, the standby state will be restored automatically, and the previous adjustment is effective. 6. Relevant data can be managed by background software through 485 bus;
使用方法 按照操作手冊連接相應的接線;2.通電時,LCD按a相計數、B相計數、C相計數順序依次顯示;短“F”鍵,依次檢查a相計數、B相計數、C相計數、本地地址、當前日期和當前地  時間,當顯示當前時間時,如果是djs ii型,按“F”鍵三次,將泄漏電流值歸零(歸零校準時請拔出數據電纜)。

http://www.syyf1029.com

產品推薦

您是第8784729位訪客

版權所有 ©2026-08-31 滬ICP備2024066546號-1 上海博沃斯自動化科技有限公司 保留所有權利.

技術支持: 八方資源網 免責聲明 管理員入口 網站地圖


主站蜘蛛池模板: 国产黄页在线观看| 99精品一级欧美片免费播放| 91精品免费视频| 久久亚洲午夜电影| 日本午夜精品电影| 欧美综合在线第二页| 欧美一级片中文字幕| 欧美二区在线| 国产在线观看精品| 91精品久久久久久久久久久久久| 国产亚洲精品网站| 国产精品自产拍在线观看| 国产精品91一区| 日韩在线视频免费观看| 欧美激情久久久久| 国产精品欧美激情| 色综合久久久久无码专区| 色播亚洲婷婷| 国产综合免费视频| 88国产精品欧美一区二区三区| 深夜福利日韩在线看| 精品国模在线视频| 午夜精品久久久久久久久久久久久 | 久久久久亚洲精品国产| 久久精品在线视频| 91国产视频在线播放| 久久久久久国产精品美女| 国产精品九九九| 欧美日韩亚洲第一| 在线天堂一区av电影| 久久国产精品久久精品国产| 久久国产精品视频在线观看| 91免费看片网站| 国产欧洲精品视频| 欧美亚洲另类在线| 午夜精品一区二区在线观看| 精品国产aⅴ麻豆| 欧美日韩在线不卡视频| 亚洲 国产 日韩 综合一区| 国产精品视频xxxx| 久久国产精品一区二区三区|