精品国产一区二区三区忘忧草_欧美日韩黄色一区二区_亚洲成在人线免费_亚洲精品永久免费

DJS-II/C公司 ABB避雷器放電記錄儀 瑞士
  • DJS-II/C公司 ABB避雷器放電記錄儀 瑞士
  • DJS-II/C公司 ABB避雷器放電記錄儀 瑞士
  • DJS-II/C公司 ABB避雷器放電記錄儀 瑞士

產(chǎn)品描述

電壓35kv 電流100A 質(zhì)保一年 認(rèn)證CCC 材質(zhì)防觸電
When the lightning arrester flows through lightning wave, operation wave or power frequency overvoltage, the strong action current will be transferred from the leakage current measurement circuit to the counter circuit, and the leakage current measurement circuit is protected. The counter part uses the principle of electromagnetic induction to obtain the signal of operation wave or power frequency overvoltage current, and then processed by the microprocessor in the display to record the number of actions
Method of use1. Connect the corresponding wiring according to the operation manual; 2. When powered on, the LCD is displayed in turn according to the sequence of phase a counting, phase B counting and phase C counting;  3. Short touch the "F" key to check phase a count, phase B count, phase C count, local address, current date and current address in turn Time, when the current time is displayed, if it is djs-ii type, press the "F" key three times to zero the leakage current value (please pull out the data cable during zero calibration).
DJS-II/C公司
Long press the "F" key, then "CLR" will prompt whether all counts are cleared, and "-" will be displayed. After a "-" appears  Execute the reset operation, and release the "F" key to exit before a "-" appears; 5. After pressing "▲" and "▼" at the same time to enter the setting state, the "year" bit flashes first, which can be adjusted by up and down keys; adopt Short touch "F" to switch to "month", "day", "hour", "minute" and "second" in sequence. When the second adjustment is over, short touch "F" to display the address code of the counter. If adjustment is needed, press "▲" and "▼" to adjust, and the adjustment will take effect immediately; During the adjustment, if the operation stops at any position for more than 7S, the standby state will be restored automatically, and the previous adjustment is effective. 6. Relevant data can be managed by background software through 485 bus;
DJS-II/C公司
Data can be downloaded and analyzed with special software through mobile computer and 485-232 transfer interface. Overall dimension, installation method and wiring diagram  Overall dimension
DJS-II/C公司
Scope of application: 3 ~ 35kV system discrete lightning arrester without (with Series) gap; 2. Power supply: AC / DC 110 ~ 220V, < 1.5W;3. Counting form: A, B and C phases are counted separately and displayed on centralized LCD; 4. Minimum capture discharge current: < 10A; 5. Minimum capture pulse width: < 1 μ s; 6. Leakage current monitoring range: 0 ~ 20mA; 7. Built in clock, power failure holding time: half a year; 8. Storage capacity: > 2000 pieces;  9. Communication interface: 485, class Modbus protocol; 10. Independent address code can be set
通過移動(dòng)計(jì)算機(jī)和485-232傳輸接口,可使用軟件下載和分析數(shù)據(jù)。

http://www.syyf1029.com

產(chǎn)品推薦

您是第8354190位訪客

版權(quán)所有 ©2026-07-24 滬ICP備2024066546號(hào)-1 上海博沃斯自動(dòng)化科技有限公司 保留所有權(quán)利.

技術(shù)支持: 八方資源網(wǎng) 免責(zé)聲明 管理員入口 網(wǎng)站地圖


主站蜘蛛池模板: 国内精品伊人久久| 午夜久久久久久久久久久| 日本不卡免费高清视频| 午夜精品一区二区三区av | 91精品国产高清久久久久久 | 日日夜夜精品网站| www.日本在线视频| 久久99久久久久久| 国产精品美女在线| 久久精品在线播放| 久久国产精彩视频| 亚洲日本无吗高清不卡| 欧美国产激情视频| 亚洲免费视频一区| 欧洲精品在线播放| 国产精品日韩欧美综合| 日本不卡一二三区| 91国产在线免费观看| 欧美 国产 综合| 91精品在线影院| 国产三级精品网站| 国产精品久久久久久av| 最新国产精品久久| 国产成人精品在线| 日韩免费在线观看av| 亚洲欧美精品在线观看| 99九九视频| 国语自产精品视频在免费| 久久av一区二区| 99免费在线视频观看| 国产精品成人一区二区| 91久久精品国产91久久| 欧美日韩亚洲一区二区三区四区| 国产精品美女久久久久av福利| 欧美 日韩 国产精品| 国产精品高潮在线| 亚洲专区国产精品| 高清国语自产拍免费一区二区三区| 天天操天天干天天玩| 高清视频一区二区三区| 91精品中文在线|