精品国产一区二区三区忘忧草_欧美日韩黄色一区二区_亚洲成在人线免费_亚洲精品永久免费

避雷器 DJS-II/B廠家 功耗低轉換率高
  • 避雷器 DJS-II/B廠家 功耗低轉換率高
  • 避雷器 DJS-II/B廠家 功耗低轉換率高
  • 避雷器 DJS-II/B廠家 功耗低轉換率高

產(chǎn)品描述

電壓35kv 電流100A 質保一年 認證CCC 材質防觸電
When the lightning arrester flows through lightning wave, operation wave or power frequency overvoltage, the strong action current will be transferred from the leakage current measurement circuit to the counter circuit, and the leakage current measurement circuit is protected. The counter part uses the principle of electromagnetic induction to obtain the signal of operation wave or power frequency overvoltage current, and then processed by the microprocessor in the display to record the number of actions
Scope of application: 3 ~ 35kV system discrete lightning arrester without (with Series) gap; 2. Power supply: AC / DC 110 ~ 220V, < 1.5W;3. Counting form: A, B and C phases are counted separately and displayed on centralized LCD; 4. Minimum capture discharge current: < 10A; 5. Minimum capture pulse width: < 1 μ s; 6. Leakage current monitoring range: 0 ~ 20mA; 7. Built in clock, power failure holding time: half a year; 8. Storage capacity: > 2000 pieces;  9. Communication interface: 485, class Modbus protocol; 10. Independent address code can be set
DJS-II/B廠家
Method of use1. Connect the corresponding wiring according to the operation manual; 2. When powered on, the LCD is displayed in turn according to the sequence of phase a counting, phase B counting and phase C counting;  3. Short touch the "F" key to check phase a count, phase B count, phase C count, local address, current date and current address in turn Time, when the current time is displayed, if it is djs-ii type, press the "F" key three times to zero the leakage current value (please pull out the data cable during zero calibration).
DJS-II/B廠家
Data can be downloaded and analyzed with special software through mobile computer and 485-232 transfer interface. Overall dimension, installation method and wiring diagram  Overall dimension
DJS-II/B廠家
Long press the "F" key, then "CLR" will prompt whether all counts are cleared, and "-" will be displayed. After a "-" appears  Execute the reset operation, and release the "F" key to exit before a "-" appears; 5. After pressing "▲" and "▼" at the same time to enter the setting state, the "year" bit flashes first, which can be adjusted by up and down keys; adopt Short touch "F" to switch to "month", "day", "hour", "minute" and "second" in sequence. When the second adjustment is over, short touch "F" to display the address code of the counter. If adjustment is needed, press "▲" and "▼" to adjust, and the adjustment will take effect immediately; During the adjustment, if the operation stops at any position for more than 7S, the standby state will be restored automatically, and the previous adjustment is effective. 6. Relevant data can be managed by background software through 485 bus;
使用方法 按照操作手冊連接相應的接線;2.通電時,LCD按a相計數(shù)、B相計數(shù)、C相計數(shù)順序依次顯示;短“F”鍵,依次檢查a相計數(shù)、B相計數(shù)、C相計數(shù)、本地地址、當前日期和當前地  時間,當顯示當前時間時,如果是djs ii型,按“F”鍵三次,將泄漏電流值歸零(歸零校準時請拔出數(shù)據(jù)電纜)。

http://www.syyf1029.com

產(chǎn)品推薦

您是第8789301位訪客

版權所有 ©2026-08-31 滬ICP備2024066546號-1 上海博沃斯自動化科技有限公司 保留所有權利.

技術支持: 八方資源網(wǎng) 免責聲明 管理員入口 網(wǎng)站地圖


主站蜘蛛池模板: 久久在线中文字幕| www国产亚洲精品| 日韩中文字幕国产| 久久久久久综合网天天| 人妻av无码专区| 国产精品69av| 亚洲一区二区三区乱码aⅴ| 欧美日韩一区二区三| 国产精品av在线| 国产精品久久精品国产| 久久亚洲精品国产亚洲老地址| 国产欧美日韩中文| 日韩一区国产在线观看| 综合久久国产| 91老司机精品视频| 久久久97精品| 欧美精品久久久久久久久久久| 精品国产综合| 久99久视频| 久久的精品视频| 久久九九国产精品怡红院| 欧美中文在线观看国产| 欧美乱人伦中文字幕在线| 日本免费高清一区| av在线com| 777午夜精品福利在线观看| 视频一区免费观看| 精品国产aⅴ麻豆| 国产精品视频免费在线观看| 日韩久久在线| 国产精品午夜视频| 午夜精品一区二区三区在线 | 99在线免费视频观看| 亚洲一区中文字幕| 国产精品一区二区在线| 美女视频久久| 日韩激情久久| 99爱精品视频| 亚洲制服欧美久久| 国产精品视频在线播放| 美女av一区二区三区|